Contracts for supply of coating lines where we designed, manufactured, delivered, installed and commissioned all equipment, after the receipt of the final acceptance protocol TKPS then entered into management contracts to manage and operate the complete lines.
Having free issue facilities, manpower and materials where TKPS took over the responsible for the safety of the operation, production, quality and liability of the coating Product, Coating and Pipe Management Equipment.
Our equipment supply covers the full spectrum of coating systems including;
- All Safety and Environmental Equipment
- Quality Control Equipment
- Pipe Handling Equipment
- Material Storage Systems
- Coating Systems
- Recycling Systems, Waste management and Treatment Systems
- Material Consumption Measuring and Monitoring Systems
- Pipe Tracking and Pipe Marking Systems
- Permits and Certificates for Plant Operations
Our Management Services
TKPS can deliver a complete management system from receipt of bare pipe to the delivery of coated pipe, our management services can cover the full range or can be tailored to suit the clients requirement, consisting of the following;
- Management Personnel
- Safety Procedures
- Safety Personnel
- Operational Procedures
- Quality Control Personnel
- Quality Control Procedures
- Operational Personnel
- Management Procedures
- Mechanical and Electrical Personnel
- Labour and Supporting Personal
- Production Output Guarantees
- Material Consumption Guarantees
- Quality Testing and Reporting
- Maintenance for all Equipment and Systems, including Spare and Wear Parts
- Material and Consumables Supply
- Warrant the Coating system and Applied Product
- Interface with the Client regarding Production, Product and Delivery Schedule
These services are offered in many forms, however the most common way when delivering a complete management system is as follow;
Production Operations
A Unit M2 rate is agreed for the production and delivery of accepted coated pipes by M2/Hour, including complete management, personal, maintenance of the plant and equipment including wear and spare parts, testing and reporting, along with a material consumption by units per M2.
The above unit rate will also cover any warranty and or guarantees agreed for the coating system and or applied product in accordance with coating procedures and specifications, in accordance with the material supplier’s warranties.
Any rejects, repairs and or recoating of pipes shall fall within the unit rate at no extra cost to the client.
Material Supply
Materials are supplied by unit rate per M2; this includes any import taxes, and or fees, delivery to site. (Unit rates for materials may be subject to an escalation agreement subject to material type)
Delivery Additionally with the materials supply we take on all liabilities with regard to product and are responsible for any and all delivery schedules to maintain the production output.
Our use of the latest technologies in the design and fabrication of coating equipment means that we can offer our Clients turn-key solutions on new coating sites. Alternatively our team of experts can assess existing Client coating facilities and propose operational improvements. In addition we can also offer to take over management control of existing coating operations to provide improved returns on investment for our Clients.